• 2001
    Entered into operation
  • 109 MW
    Installed capacity
  • 350妇女和
    Annual production

The Malana hydropower plant utilises the water from the Malana river and helps to meet the power shortages in the Northern region. In the months from November to May, the plant operates at peak capacity. During the rest of the year, it is operated as a base load plant.

Water is collected at the plant's intake and then transferred via an underground headrace tunnel and steel surface penstock into the powerhouse at Chauki village. Power is transmitted to the Himachal Pradesh State's Bajaura connection point via a high voltage transmission line built by the plant.

The hydropower plant was constructed and commissioned ahead of schedule, resulting in lower project costs. Out of eight projects allocated by the government of Himachal Pradesh, Malana is the only project to be completed ahead of time.

 

Malana hydropower plant
Malana hydropower plant. (Photo: 十大最好的网赌平台)

The company is certified in ISO 9001, ISO 14001 & 18001年纪录. These certifications underline the company’s efforts within quality of generation, supply of dependable power to our customers, preventing pollution, ensuring a safe workplace and caring for the health of our employees.

 

Malana hydropower plant
Malana hydropower plant. (Photo: 十大最好的网赌平台)
公司 Ownership share
十大最好的网赌平台 49%
Bhilwara Energy Limited 51%